Combines stacking helicals on p1

  • Thread starter Hyper_Harvest_II
  • Start date

Hyper_Harvest_II

Guest
Okie, The first cage door that gets double stacked is the one right above rear feed conveyor opening.This cage door from factory has one long and one short helical on it.Double stack the existing long helical,then add two more helicals to this cage door and double stack them also.Then,go to next cage door above that one.This cage door from factory had three long helicals and one short.Double stack the three long helicals and then add one more long helical and double stack it also.Remember that you will have to elongate the hole in one end of the helical bar that sets next to cage to allow bolt to be installed.The other two holes will allow bolts to be installed. Good luck, Hyper Harvest II
 
 
Top